Dear All expertd,
We have set up a new SAP PO server and just want to know how to do below configurations which was done in ABAP stack in previous versions..
- How to peform SLDCHECK ?
- Message Schedulling (RZ70)
- ECC / PO cennection set up..
- and How to check ECC and PO connections are working fine and SLD working fine.
Thanks